← NRC enforcement actions

NRC CAL – NOV (SL III)

EA-09-268 · CAL · Severity SLIII · Issued 2010-06-09 · Fuel Cycle Facilities

Action

EA Number
EA-09-268
Licensee
NOV (SL III)
Category
Fuel Cycle Facilities
Action type
CAL
Severity level
SLIII
Date issued
2010-06-09

Description

On June 9, 2010, a Notice of Violation and Exercise of Enforcement Discretion (Notice) was issued to Global Nuclear Fuels – Americas, LLC (GNF-A). This action was based on a Severity Level III problem involving three violations of regulatory requirements. Specifically, the licensee failed to (1) identify credible accident scenarios as required by the license; (2) characterize criticality accident scenarios in the integrated safety analysis (ISA) as high consequence events as required by the license; and (3) designate engineered or administrative controls as items relied on for safety (IROFS) when necessary to comply with the performance requirements of 10 CFR 70.61(b) – (d), as required by 10 CFR 70.61(e). Because, in part, the NRC staff and the licensee did not share a common understanding of GNF-A's application of its ISA methodology to scenario evaluation and IROFS identification during the ISA summary review and related inspection activities, the NRC concluded that enforcement discretion to forego proposing a civil penalty was appropriate in this case. No actual consequences resulted from these violations because there were no incidents and no existing safety controls were identified as degraded.

Source

Full letter
PDF on NRC ADAMS
NRC index
Fuel Cycle Facilities enforcement actions
Machine
JSON-LD · Markdown